Project Status - Podium 2 Works Completed

Project Status
Construction
Updates
  • Superstructure works up to level 16 is complete and lower roof slab is ready for casting.
  • Parking levels: MEP works, masonry, painting is in progress.
  • Typical Floors: Masonry, plastering, MEP works, tiling works, paint surface preparation is in progress.
ConsultantEMSquare Engineering Consultants
ContractorAdnan Contracting LLC

Live where the world wants to invest - JVC, Dubai

Welcome to Blossom76, a tranquil oasis in the heart of emerging Dubai. Nestled within the vibrant Jumeirah Village Circle, District - 17. Blossom76 offers an exquisite collection of residences from fully furnished studios to palatial 2-bedroom suites, each crafted with meticulous attention to detail, with a range of features including private plunge pools and high-end finishes.


Rising elegantly above the city skyline, this architectural masterpiece showcases an impressive layout of Ground (Retail) + 4 Levels of Parking + 16 Residential Floors + Rooftop , 111 exclusive residential unit that offer unmatched panoramic views, world-class amenities, and a lifestyle that harmonizes urban sophistication with tranquil elegance. Blossom76 is not just a home; it's where you belong.

Property Image

Amenities

Temperature controlled Swimming Pool with Ledge Lounger

Kids Play Area

Rooftop Panoramic Fitness Studio

Yoga/Meditation Area

Outdoor Family Sitting Area

BBQ Party Area with Beautiful Landscaped Gardens

Are you interested in staying informed
about this property?

Subscribe to our newsletter

Location

8

Min
Sheikh Zayed Road

2

Min
Al Khail Road

18

Min
Palm Jumeriah

25

Min
Downtown Dubai

20

Min
Dubai Marina

25

Min
Dubai International Airport

20

Min
Mall of the Emirates

12

Min
Dubai Hills Mall